500+ units installed across DFW.

Pictures show the outputs. The real value is the schedule we kept underneath โ€” and the cost per unit that dropped every phase.

500+
Units installed
48 hr
Avg per-unit install
11%
Avg cost-per-unit cut at volume
<2%
Callback rate
Multifamily kitchen install
Case study ยท Multifamily

48-unit cabinet refresh, North Dallas.

Full kitchen + vanity swap across 48 units on a rolling turn program. Crews sequenced in pairs to keep the property generating rent throughout.

  • โœ“ Avg. 36 hours per unit (kitchen + bath)
  • โœ“ 0 scope disputes at handoff
  • โœ“ Repeat program signed for sister property
Case study ยท Production build

24-home builder spec, Fort Worth.

Daily rolling install cadence matched to the framer + drywall sequence. Shrunk the cabinet line from 6 days to 3 per home.

  • โœ“ Full kitchen + baths + laundry
  • โœ“ Punch-list cleared same-day at final
  • โœ“ Became default cabinet sub for phase 2
Production home kitchen install
Investor portfolio kitchen install
Case study ยท Investor portfolio

12-flip portfolio across DFW metro.

Standardized cabinet spec across 12 flips. Drove cost per unit down 11% from home #3 onward by normalizing the cabinet line.

  • โœ“ Single finish package, repeatable
  • โœ“ Batch purchasing via direct supplier
  • โœ“ Shaved 2โ€“3 days off resale timeline
Gallery

More unit work.

Ask for a reference โ†’
Kitchen install
Kitchen cabinets
Kitchen remodel
Modern kitchen
Vanity install
Bathroom vanity
Kitchen view
Install crew

Replace with real job-site photos at /site/img/.

Want to see more of a specific scope?

We can send references, photos, and past scope packages relevant to your project.

๐Ÿ“ž Call Get quote โ†’